Language: English line Русский язык
Products

Cement Silo

Sheet-assembled 50T Cement Silo

  • Type:50
    Volume:50t
    Tank diameter:3m
    Tank height:5.4m
    Total height:12m
    Match the host:JS500
    Match the screw conveyor:LSY185-6
  • INQUIRY
Type Volume Tank diameter Tank height Total height Match the host Match the screw conveyor
50 50t 3m 5.4m 12m JS500 LSY185-6

    1.The sheet-assembled cement silo is designed for resolving the difficulties in export packing on-site silo making construction site transferring extra-high and extra-wide transportation.
    2. The sheet-assembled cement silo is a kind of closed storage tank which is safe reliable and convenient to be installed.
    3. It has the materials level meter which can display the location and quantity of the materials. And the safety valve on the top of cement silo is used to balance the pressure difference between inside and outside.




    1.Waterproof moistureproof prevent the loss of cement reduce urban air pollution small footprint long service life and low cost. It is the environmental friendly construction machinery promoted widely in China.
    2. We have a lot of stock of bulk cement silo in general Capacity :100t150t 200t  300t. It can be produced in different size according to user’s requirements.
    3. The cement silo is generally cylindrical structure. There are a dust removal equipment on it to prevent dust leakage and a brake device under it to prevent dust caking so the powder can be discharged smoothly.


    The sheet-assembled cement silo applies to engineering construction concrete mixing stations roads and bridges water conservancy urban construction and other projects. It is also suitable for storing grain cement fly ash and other bulk materials.

    1. Bulk cement truck transports the cement to the site. 
    2. Conveying the cement in truck to cement silo by the air pressure of the truck.
    3. Conveying the cement in cement silo to the concrete mixer by the screw conveyor.


    1. The welding between the bottom legs and pre-embedded parts should be firmed.
    2. Installing a lightning rod device on the top of the cement silo. 
    3. Keeping the pipeline clean when discharging.
    4. Checking and cleaning the cement bag regularly.
    5. Be sure of the valve switches of the cement silo all in good conditions when changing operator.
    6. Checking the pressure gauge regularly to ensure the accuracy of the wind pressure value when discharging.
Share to :
GET QUOTATION
If you are interested in these products, please leave your message,then,the relevent staff will contact you quickly . (Note: Please fill in your correct information)! Please send all your requests and proposals to [email protected].
Name:
Tel:
Country:
E-mail:
Inquiry:

Product Catalog

LATEST NEWS



Contact Us

Tel: +86 15603907208

Email: [email protected]

Add: 200 meters east at the intersection of Longjiang Road and Huaiyang Road,Shangjie District,Zhengzhou City,Henan province,China.

  • Follow Us:
  • facebook
  • youtube
  • twitter
  • google
  • linkedin

WhatsApp
Email
Message
Inquiry XINFENG