Four steps to clean the concrete mixers
With the development of new countryside, the establishment of new countryside, the transformation of the old city and the commencement of other aspects, the establishment of the road, the bridge, the house and so on are flourishing. The concrete is the main material of the construction of the concrete. The concrete mixer is a kind of construction site The ambition to stir the equipment. Relative to the bridge machine, crane, the repair and maintenance of the mixer is relatively simple, but can not be underestimated, perhaps a small detail will directly affect the use of concrete mixer, such as: concrete mixer clean.
The following should be taken into account when cleaning the concrete mixer:
First, punctual maintenance procedures for the maintenance of the rules, maintenance work, such as cleaning, lubrication, refueling, etc.
Second, the concrete mixer before starting to check the controller can be outstanding, after the shutdown and water and stones into the mixing tube 10 to 15 minutes for cleaning, and then clear the water and stones. If the operator is required to enter the mixing cylinder to clean, in addition to intercept the power and remove the fuse, and to lock the switch box.
Third, to prevent the use of sledgehammer hit the method of eradication in the concrete mixer barrels of concrete, can only be used to eradicate chisel.
Fourth, in the cold season, the mission is completed after the application of water to clean the mixer drum and the water pump, water tank, water inside the water put the net, to prevent water pumps, water tanks, water pipes and other frozen.
Zhengzhou Xinfeng Machinery Co., Ltd. Main concrete mixer,
concrete mixing station, stabilized soil mixing station, concrete batching machine, concrete conveying equipment, please call to discuss!