Language: English line Русский язык line Español line عربية‎
Products

Concrete Mixing Plant

35m3/h Concrete Mixing Plant

  • Model:HZS35
    Maximum productivity: 35
    Discharging height(m): 1.6-3.8
    Working cycle time(s): 72
    Outline dimension(mm): 12922×13000×17245
    Total power (kw): 75
    Total weight: 23T
    with high performance cost ratio for construction projects
     
  • INQUIRY
  • About
  • Specifications
  • Components
  • Advantage
  • Installation
  • Attention

1.HZS35 concrete mixing plant adopts automatic control system with advanced performance and is ideal equipment to produce commercial concrete. 
2.It is widely used in large infrastructure construction such as buildings highways bridges airport water conservancy project and precast factories. 


 

Model

HZS25

HZS35

HZS50

HZS75

Global 

parameter

Maximum productivity (m3/h)

25

35

50

75

Discharging height (m)

1.5–3.8

1.6–3.8

4.2

4.2

Working cycle time(s)

72

72

72

72

Outline dimension(mm)

11693×13060×

17245

12922×13000×

17245

15689×12500×

18704

17608×12500×

18704

Total power (kw)

50

75

88

110

Mixer

Model

JS500

JS750

JS1000

JS1500

Batcher

Model

PLD800

PLD1200

PLD1600

PLD2400

Pneumatic 

system

Air compressor

1.0–7

1.0–7

1.5–7

1.8–7

Discharge pressure(MPa)

0.8

0.8

0.8

0.8

Displacement (m3/min)

1.67

1.67

1.67

1.67

Motor power

5.5

5.5

7.5

11

Measurement 

system

Aggregate weighing accuracy

±2%

±2%

±2%

±2%

Cement weighing accuracy

±1%

±1%

±1%

±1%

Water weighing accuracy

±1%

±1%

±1%

±1%

Additive weighing accuracy

±1%

±1%

±1%

±1%


HZS series concrete mixing plant is composed of aggregate batcher concrete mixer cement supply system water supply system cement weighing system water weighing system and control system and so on.
The first step is to put the aggregate into aggregate batcher by loader and then weigh them on weighing hopper. Thirdly the operator should put them into the hopper of mixer by conveyor. 
As for cement and water firstly they should be fed into cement weighing hopper and water weighing hopper by screw conveyor and water pump respectively. Secondly the operator should put them into mixer after weighing.
The mixer begins to work after all the materials are ready. The operator can carry away the concrete after mixing.

 

1. Electronic weighing of aggregate water cement and additive is more precise and has higher efficiency.
2. The main mixer JS750 twin shaft concrete mixer belongs to forced concrete mixer and has high mixing efficiency. It can be used to mix hard-dry concrete and the product has good quality.
3. Modularization structure makes it easy to be installed and relocated.
4. Full automatic computer control ensures high quality and precise production.
5. HZS35 concrete mixing plant is easy to maintain with low maintenance cost.
6. Anti-noise design and dust collection system make our plant friendly to the environment.


1. Installation
Installation site should be plain and well-grounded. The pithead should be higher than ground to prevent the water inflow.
Lift the mixer with lifting device and install four supporting legs connecting angle inclined strut ladder and the downward track. Then place the mixer in the appropriate place of the pit.
2. Inspection and preparation before test
Check if the connection of the motor and electric element is steady. 
Check connecting bolts between two parts(especially the moving parts) and ensure they are firm. If not tight them up in time. 
Check if there are sundries stuck in mixing canister and track rack.
3. No-load test
Start mixing motor. At the same time the running direction of two mixing shafts should be same with indicating direction of the signs . If there is any difference change the power connection.
4. Over-load test
Shut down the discharge door and lift the hopper after feeding. Insure that the hopper can run steadily and stop on the track freely. If there is slipping you should put the hopper into the pit bottom then adjust the big nut in brake motor.

1. Focus on the maintenance of quick-wear parts and reserve appropriate spare parts.
2. When the machine is on maintenance adjustment or cleaning cut off the total power switch and hang a warning sign.
3. Contact with local power supply departments and require them to supply reliable electric power . 
4. There must be an experienced electrician who is responsible for the daily maintenance of electrical equipment specially.
5. If the plant installed is taller than the surrounding buildings or equipment the lightning protection facilities should be collocated.
6. All the safety signs shall be inspected at least once every six months. If there is any damage deformation color fading etc. the signs should be repaired or replaced in time.

Share to :
Inquiry XinFeng
If you are interested in these products, please leave your message,then,the relevent staff will contact you quickly . (Note: Please fill in your correct information)! Please send all your requests and proposals to admin@zzxfjxwm.com.
Name:
Tel:
Country:
Email:
 
Inquiry:
 

Product Catalog



Contact Us

Tel: 0086-371-88810297

Email: admin@zzxfjxwm.com

Add: 200 meters east at the intersection of Longjiang Road and Huaiyang Road,Shangjie District,Zhengzhou City,Henan province,China.

  • Follow Us:
  • facebook
  • youtube
  • twitter
  • google
  • linkedin

WhatsApp
Email
Message
Inquiry XINFENG