  •  1.Excellent manufacturing team with experience of over 20 years.
     2.All can be customized to meet your needs&boost productivity.
     3.Passed CE&ISO9001:2008 quality attestation.
     4.Long-term cooperated transport company ensure the timely and safe delivery.
     5.One-stop service save your precious time.
  • INQUIRY
  • About
  • Specifications
  • Components
  • Advantage
  • Installation
  • Attention

Double Concrete Mixing Plant adopt two JS twin-shaft mixer so it can mix dry-hard concrete plastic concrete lightweight aggregate and kinds of mortar. What’s more due to its high working efficiency and large capacity output the Double Concrete Mixing Plant is widely used in large and medium sized construction road bridge railway and others. In short the Double Concrete Mixing Plant is ideal equipment for users to buy.
Features of Double Concrete Mixing Plant:
 1. The mixing system adopts JS series twin-shaft concrete mixer with good mixing homogeneity.
 2. With compact structure of modular organization which can meet the requirements of container transport and is convenient for transport and quick installation dis-assembly.
 3. Aggregate lifting appliance adopts frequency control thus providing smooth and reliable operation.
 4. Lubrication system adopts advanced centralized oil lubricating system convenient for oil supplying this system is equipped with over voltage warning and low oil level warning safe and reliable.

Model HZS25*2 HZS35*2 HZS50*2 HZS75*2 HZS60*2 HZS90*2 HZS120*2 HZS180*2
Global
parameter
Maximum productivity
 (m3/h)
50 70 100 150 120 180 240 360
Discharging height (m) 1.5–4.2 1.6–4.2 4.2 4.2 4.2 4.2-4.5 4.5 4.5
Working cycle time(s) 72 72 72 72 60 60 60 60
Total power (kw) 50*2 75*2 88*2 110*2 105*2 145*2 210*2 288*2
Mixer Model JS500*2 JS750*2 JS1000*2 JS1500*2 JS1000*2 JS1500*2 JS2000*2 JS3000*2
Batcher Model PLD800*2 PLD1200*2 PLD1600*2 PLD2400*2 PLD1600*2 PLD2400*2 PLD3200*2 PLD4800*2
Pneumatic
system
Air compressor 1.0–7 1.0–7 1.5–7 1.8–7 1.5–7 1.8–7 1.8–7 1.8–7
Discharge pressure
(MPa)
0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8
Displacement (m3/min) 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67
Motor power 5.5*2 5.5*2 7.5*2 11*2 7.5*2 11*2 11×2*2 11×2 *2
Measurement
system
Aggregate weighing 
accuracy
±2% ±2% ±2% ±2% ±2% ±2% ±2% ±2%
Cement weighing
 accuracy
±1% ±1% ±1% ±1% ±1% ±1% ±1% ±1%
Water weighing 
accuracy
±1% ±1% ±1% ±1% ±1% ±1% ±1% ±1%
Additive weighing 
accuracy
±1% ±1% ±1% ±1% ±1% ±1% ±1% ±1%
Total weight 32T 46T 56T 74T 72T 92T 104T 140T

【Tunnels, bridges, requiring special, high-quality works】



XINFENG recommended you use Double Concrete Mixing Plant
1. Do not delay the duration once a line problems another line of normal supply of concrete does not affect the progress of the entire duration.
2. Has double the production capacity for the catch period of the mountain the Central Mix Concrete Plant is an essential mixing station which solves the problem of transporting concrete is not convenient.

If you need【price】 and more technical detailsplz 【leave a message with your email and requirement】.

1. Installation
Installation site should be plain and well-grounded. The pithead should be higher than ground to prevent the water inflow.
Lift the mixer with lifting device and install four supporting legs connecting angle inclined strut ladder and the downward track. Then place the mixer in the appropriate place of the pit.
2. Inspection and preparation before test
Check if the connection of the motor and electric element is steady. 
Check connecting bolts between two parts(especially the moving parts) and ensure they are firm. If not tight them up in time. 
Check if there are sundries stuck in mixing canister and track rack.
3. No-load test
Start mixing motor. At the same time the running direction of two mixing shafts should be same with indicating direction of the signs . If there is any difference change the power connection.
4. Over-load test
Shut down the discharge door and lift the hopper after feeding. Insure that the hopper can run steadily and stop on the track freely. If there is slipping you should put the hopper into the pit bottom then adjust the big nut in brake motor.

1. Focus on the maintenance of quick-wear parts and reserve appropriate spare parts.
2. When the machine is on maintenance adjustment or cleaning cut off the total power switch and hang a warning sign.
3. Contact with local power supply departments and require them to supply reliable electric power . 
4. There must be an experienced electrician who is responsible for the daily maintenance of electrical equipment specially.
5. If the plant installed is taller than the surrounding buildings or equipment the lightning protection facilities should be collocated.
6. All the safety signs shall be inspected at least once every six months. If there is any damage deformation color fading etc. the signs should be repaired or replaced in time.
 

Share to :
The last:Mini Concrete Batching Plant Next:no
Inquiry XinFeng
If you are interested in these products, please leave your message,then,the relevent staff will contact you quickly . (Note: Please fill in your correct information)! Please send all your requests and proposals to admin@zzxfjxwm.com.
Name:
Tel:
Country:
Email:
 
Inquiry:
 

Product Catalog



Contact Us

Tel: 0086-371-88810297

Email: admin@zzxfjxwm.com

Add: 200 meters east at the intersection of Longjiang Road and Huaiyang Road,Shangjie District,Zhengzhou City,Henan province,China.

  • Follow Us:
  • facebook
  • youtube
  • twitter
  • google
  • linkedin

WhatsApp
Email
Message
Inquiry XINFENG