How to maintain the machine of concrete mixing plant--Maintenance 1

 

Maintenance 1


 Today, let’s look at how to maintain the machine and we all know good maintenance can keep the machine working in a longer period.We divided the maintainance into different part to introduce.

Routine maintenance

1, to ensure cleaning of the machine and the surrounding environment.
 
2, the timely removal of accumulated material in the hopper, the sensor normal to zero.
 
3. Check the oil lubrication points adequacy of the gas system in the mist should maintain an adequate amount of oil.
 
4. Check the electrical, electronics or without overheating, abnormal noise, the instrument indicates whether the normal signal system is intact.
 
5, regular inspection, adjustment cylinder, valve and solenoid valve, so that the opening and closing to meet the requirements.
 
6, regularly check the system, such as tainted ash, leakage, oil spills and leakage phenomenon must be promptly treated.
 
7, mixers and the hopper should be cleaned once every four hours, in order to avoid residual concrete consolidation, impede the normal operation.
 
8, the class should let go of the air compressor, air tank and filters the water inside, and troubleshoot the operation appears.
 
9, butterfly valves, mixers, solenoid valves, air filters and oil mist, etc. in accordance with the maintenance manual.
 

Aggregate supply system maintenance

1, class work must be carried out before the conveyor belt load inspection, clean up debris, mud stick, fastening various parts of screws, adjust the belt deviation phenomenon, all rotating parts should be flexible rotation.
 
2, electric drum by the use of manual require regular oil changes.
 
3, after use for six months to check and top-up at the turning parts bearing grease, after an oil change once a year to conduct a comprehensive demolition.
 
4, Sweepers regularly examine and adjust the frying position close to the belt, to ensure clear material properly.
 

Metering System Maintenance

1, the class must examine and adjust the weighing hoppers each soft interfaces, there are loose on the length of the holding, to ensure measurement accuracy.
 
2, after the winter shutdown, should the water supply system, the supply of water in all admixtures drained.
 
3, additives such as seasonal deactivate the pump must be backwashed to prevent precipitation in the pipeline and pump additive product sticky or no solvent.


To be continued......


Zhengzhou Xinfeng Machinery Co., Ltd. Main concrete mixer, concrete mixing station, stabilized soil mixing station, concrete batching machine, concrete conveying equipment, please call to discuss!

Share to :
GET QUOTATION
If you are interested in these products, please leave your message,then,the relevent staff will contact you quickly . (Note: Please fill in your correct information)! Please send all your requests and proposals to [email protected].
Name:
Tel:
Country:
E-mail:
Inquiry:

Latest News



Contact Us

Tel: +86 15603907208

Email: [email protected]

Add: 200 meters east at the intersection of Longjiang Road and Huaiyang Road,Shangjie District,Zhengzhou City,Henan province,China.

  • Follow Us:
  • facebook
  • youtube
  • twitter
  • google
  • linkedin

WhatsApp
Email
Message
Inquiry XINFENG